![]() |
||
|
|
||
|
|
||
| Finally there is a building-integrated photovoltaic system capable of lowering return on investment to less than 10 years in some states. Because virtually every aspect of the EnergyPeak™ approach is standardized, EnergyPeak™ Providers are able to offer building owners and builders a proven and warranted building-integrated photovoltaic standing seam metal roof system with an outstanding payback period. And to prove it, EnergyPeak™ Providers have at their disposal a sophisticated ROI software program that creates project-specific reports highlighting both energy output data and return on investment projections. These reports also identify rebates, tax credits and renewable energy credits the prospective project may be eligible to receive. To learn more, visit www.energypeak.com. | ||
|
|
||
![]() |
![]() |
|
| Fabral Solar SSR System Available With Four Of The Company's Standing Seam Roofing Profiles | Uni-Solar® Photovoltaic Laminates Are Key Component Of The EnergyPeak™ Solar Standing Seam Metal Roof System | |
|
Fabral has announced the availability of its new Solar SSR system. The system utilizes thin film photovoltaic laminate technology and features the highest quality, UL-approved components. The system offers a 10-year return on investment and comes with a 20-year warranty. The Solar SSR option is available on four profiles of Fabral roofing—1-1/2” SSR, Thin Seam, Slim Seam and Snap-on-Seam. (more)
|
United Solar Ovonic's Uni-Solar® photovoltaic laminates are the backbrone of the EnergyPeak™ system. Just 4mm thick and weighing less than 1 lb. psf, these durable, flexible thin-film laminates are packed with power potential and are ideally suited for integration with standing seam metal panels. They can be applied in the factory or at the job site, including on existing roofs.
|
|
|
|
||
![]() |
American Eurocopter
Location: Columbus, MS General Contactor: Turner Construction, New York, NY Dealer/Installer: F. L. Crane & Sons, Inc., Fulton, MS Roofing Contractor: N/A Architect: JBHM Architects, Columbus, MS Project Start Date: April 2007 Completion Date: September 2007 Total Project Cost: N/A Total Sq.Ft. of Facility: 85,000 sq.ft. on 40 acres |
|
|
|
||
![]() |
||
![]() |
||
![]() |
||